High Volume Production Work
800 set run of steam heater cabinets in Gloss White
Run of 9,000 NYC Citibike parking units in two coats of silver and clear.
Run of 9,000 NYC Citibike parking units in two coats of silver and clear.
Run of 9,000 NYC Citibike parking units in two coats of silver and clear.
#1 accumulation conveyor rising above coated Slant Fin end caps.
#1 accumulation conveyor rising above coated Slant Fin end caps.
#1 accumulation conveyor with 125,000 window latch keepers rising above coated Slant Fin end caps.
#1 accumulation conveyor with 125,000 window latch keepers rising above coated Slant Fin end caps.
Run of 250,000 zinc die cast window latches being staged on #1 accumulation conveyor for Gloss White coating.
Run of 125 Trikes in Yellow
Run of 200 bicycle frames
Run of 800 tricycle baskets to be coated Gloss Black
Run of 1000 store fixture weldments
Run of 8000 rebar spacers being coating with green epoxy through automatic booth on overhead conveyor #3.
Run of 2000 exit sign frames.
Run of 600 medical slide cabinets.
Run of 1800 medical slide cabinet drawers
350 set run of die cast ceiling exit signs
5,000 piece run being staged on accumulation conveyor #2 while overhead conveyor #2 finishes medical drawers in tan.
5000 Zinc die castings in Bonded Aluminum
300 set run of bicycle frames in Gloss Red
Run of 250 electronic rack enclosures
180 Chain saw cases being silk screened after Red Gloss coating
180 Chain saw cases being silk screened after Red Gloss coating
Run of 9600 welded and coated Slant Fin end caps.
Hydraulic scissor accumulation lift for pack off and transfer to roller conveyor in background.
Run of 300 "pizza" delivery boxes for NYC delivery trikes.
Window Guards
Window Guards
Rear package shelf for work tricycles
Rear package shelf for work tricycles
Rear package shelf for work tricycles ready for delivery
Rear package shelf for work tricycles ready for delivery
250,000 window hardware parts per week
9600 Slant Fin End Caps staged for coating after spot welding and degreasing.
9600 Slant Fin End Caps staged for coating after spot welding and degreasing.
End caps being retrieved from accumulation conveyor onto coating conveyor.
End caps being retrieved from accumulation conveyor onto coating conveyor.
View of accumulation conveyor near ceiling, coating conveyor below and coated roller conveyor ready for pack off.
Warehouse with unwelded end caps on the left and finished welded and coated end caps on the right.
2nd floor receiving door for cartons and chipboard
2nd floor receiving door for cartons and chipboard
Driggs Ave. sidewalk storage.
Roller balls to manuver pallets of chipboard and cartons.
Roller system to move pallets of cartons on 2nd floor.